• PROJECTS
  • BLOG
  • CONTACT
  • ABOUT
HARD WORK PARTY

HARD WORK PARTY

  • PROJECTS
  • BLOG
  • CONTACT
  • ABOUT

WWD LIGHT WORK

In less than two weeks from brief to delivery, we made this — a 280-channel rig that runs an hour-long, audio-reactive, dynamic program of custom looks.

It's made to be integrated into an armature behind a massive diffusion structure lofted above the audience in an inflatable temporary structure at South Street Seaport for WWD's '10 of Tomorrow' event.

Ancillary Magnet testing documentation on LED and software rig for WWD's Ten of Tomorrow event with Industria Creative. This video is annoyingly horizontal because the piece is 14' long. Deal with it.


tags: work, led, lighting, design, software, sculpture, events
Thursday 12.18.14
Posted by CHIEF
Newer / Older

©2016 HARD WORK PARTY